- Home
- ยป
- Products & Services
- »
- Steam Turbines
Steam Turbines
We are engage inPower Sectorviz
1.Biomass Power Plants.
2.Thermal Power Plants.
3.Gassification Power Plants.
4.Co-gen Power Plants.
5.Solar Power Plants.
6.Electrical Sub-stations.
7.Electrical Installation, Testing & Commissioning.
Steam Turbine
Minimum Order Quantity: 1 Piece
Power | 1KW -5 MW |
Usage/Application | Power Generation |
Pressure Range | 10 bar - 87 bar |
Generator/Alternator Type | Biomass Generator |
Power Capacity | 1 KW to 40 MW |
Model Name/Number | NST/Siemens/Triveni/Bellies |
I Deal In | New and Second Hand |
Material | SS-304 or as per specifications |
Speed | 3000 x 3000, 6000 x 1500 or as per requirement |
Frequency | 50 Hz and 60 Hz |
Country of Origin | Made in India |
A steam turbine is a device that extracts thermal energy from pressurized steam and uses it to do mechanical work on a rotating output shaft. Its modern manifestation was invented by Charles Parsons in 1884.
The steam turbine is a form of heat engine that derives much of its improvement in thermodynamic efficiency from the use of multiple stages in the expansion of the steam, which results in a closer approach to the ideal reversible expansion process. Because the turbine generates rotary motion, it is particularly suited to be used to drive an electrical generator—about 85% of all electricity generation in the United States in the year 2014 was by use of steam turbines.[3] A steam turbine connected to an electric generator is called a turbo generator.
Additional Information:
- Production Capacity: as per required
- Delivery Time: for 1 KW its 5-6 days
- Packaging Details: as per product
Back Pressure Turbine
Minimum Order Quantity: 1 Piece
Power | Electric Power |
Usage/Application | Power Generation |
Pressure Range | 5 Bar to 87 Bar |
Generator/Alternator Type | Biomass Generator |
Power Capacity | 1 KW to 40 MW |
I Deal In | New and Second Hand |
Country of Origin | Made in India |
Additional Information:
- Production Capacity: As required
- Delivery Time: 5 days to 6 months
- Packaging Details: As required